PROJECT BRIEF:

This 7,700 m² of premium warehouse and office space on 15,780m2 site is now complete, we couldn’t be more proud to collaborate with Tradezone.

Key highlights of this standout build include: 

  • Cantilever concrete blades on the 2-storey office block
  • Post-tension slabs with no joints
  • 14m high clear-span warehouse for maximum efficiency
  • 1-million-liter detention tank
  • 1,500 m² awning area for smooth operations

    Delivered ahead of schedule and under budget, this project is a testament to the incredible effort and collaboration of our entire team.

SMARTSTORES METROPLEX

Project Description

Client: Smartstores

Location: Year Completed: 2024

PROJECT BRIEF:

This development consists of 26 boutique industrial units, covering 5,014 square metres and sits on 9,580m2 parcel of land 

Some of the standout features of this project include:

  • A 5.5-meter high sandstone retaining wall, 
  • 117 tilt panels, collectively covering an impressive 6,600m² of surface area.
  • 8,658m2 of concrete, both slab on ground and Suspended concrete mezzanines
  • Spacious high bay, clear span warehouse areas.
  • Custom fit outs internally
  • A range of Architectural features and finishes externally set this project apart 
Morningside Industrial

MORNINGSIDE INDUSTRIAL

Morningside Industrial

Project Description

Client: Private Developer

Location: Year Completed: 2024

PROJECT BRIEF:

Located in Brisbane’s, Morningside, this impressive development spans 8,600 square metres, featuring a striking office façade that blends functionality with contemporary design.

Key features include:

  • 8,540sqm* Total floor area
  • 7,700sqm* High Bay warehouse
  • 840sqm* of corporate grade office over two levels
  • 14,910sqm* General Industry-B zoned site
  • 12.45m* Internal height at the ridge
  • Access via three (3) Recessed Loading Docks and ten (10) Roller Shutter Doors
  • 15m all-weather awning
  • 90 on-site car parks
  • Heavy-duty hardstand with B-Double access
  • ESFR fire sprinklers
  • 100kW solar system installed for tenant’s benefit
  • LED lighting throughout

YARRABILBA, QLD

Project Description

Client: Private Developer

Location: Yarrabilba, QLD

Year Completed:   2024

This unique project features 30 Units, including 10 Warehouses with custom built fit outs and 20 storage units, all designed and constructed by our team.

Key highlights of this standout build include:

  • Completed in just 10 months
  • 5360m2 Site
  • 3844m2 GFA
  • Warm Shell office to 10 Units.
  • Mezzanine and stair access to storage
Delivered ahead of schedule and under budget, this project is a testament to the incredible effort and collaboration of our entire team.

NEW CLEVELAND ROAD

Project Description

Client: Private Developer

Location: New Cleveland Road, Tingalpa QLD

Year Completed:   2024

PROJECT BRIEF:

This expansive building spans 7,011sqm on a site that measures 11,600sqm, featuring 5 specialized industrial warehouses, over 2 levels on suspended slab, each equipped with office space on the ground floor.

The construction process of large excavation, it included the use of tilt panels, post tension slabs and a mix of architectural cladding leading to the impressive outcome.

BETHANIA LIFESTYLE CENTRE

 

 

Project Description

Client: OPD Developers

Location: Glassons Drive, Bethania QLD

Year Completed:   2023

PROJECT BRIEF:

13 Tenancy Retail Complex comprising of national and local tenants such as EMF Gym, Total Tools, Autobarn, Chemist Warehouse and DTMR. Our team achieved PC 3 months ahead of programme, overcoming the challenging site with rock encountered during the civil works stage. A huge 26,600m2 site
with tilt panel with concrete access ring road and bitumen carpark, poured a total of 5000m3 concrete, 11,700m2 of roofing laid, 816m2 of external glazing installed and 7,740m2 of bitumen pavement to the customer carpark.

RIPLEY MIXED USE

 

 

Project Description

Client: LRP Developers

Location: Ripley Drive, Ripley QLD

Year Completed:   2023

PROJECT BRIEF:

Ripley Mixed Use included a beautifully designed Childcare centre and two fast-food chains; Guzman N Gomez & Red Rooster. The impressive 10,000m2 site posed some challenges in the Civils, the 7m high retaining structures, but nothing was too big nor too difficult for our team. Still able to complete as
planned within 12 months.

SMALLWOOD PLACE

 

 

Project Description

Client: Metro Dev

Location: Smallwood Place, Murrarie QLD

Year Completed:   2023

PROJECT BRIEF:

We transformed ideas into a stunning reality, delivering a project that redefines commercial spaces. Design and costruction of the tilt panel warehouse included; 2000m2 of high-level industrial space on a suspended warehouse slab, providing versatility and functionality with 1610m2 office space over 2 levels. Finished with a conveiently designed basement carpark accommodates 103 vehicles, ensuring easy access for everyone.

CRESTMEAD WORKSPACES

 

 

Project Description

Client: Archon Capital

Location: Magnesium Drive, Crestmead QLD

Year Completed:   2023

PROJECT BRIEF:

We proudly announce the completion of our recent Design & Construction for this cutting-edge Industrial complex. Spanning over 2236m², the complex features a generous 1227m² building area, boasting 7x roller door units complete with mezzanines, convenient kitchenettes, and modern toilet facilities. The exterior package includes ample parking, a convenient bin store, and beautifully landscaped gardens.

VERSACE TIMBERS

 

 

Project Description

Client: Versace Timbers

Location: 33 Vauxhall Street Virginia QLD

Year Completed:   2023

PROJECT BRIEF:

State of the art, Head Quarters and Warehouse for the team at Versace Timbers. Prekaro Projects commenced demolition of the existing Versace Timbers facility in Virginia. We were engaged early to complete the Design and Approval process for the purpose-built facility in March 2023. Due to the subject sites’ exposure to flood water the whole site will be raised 600mm as per of the earthworks. The facility consists of a 2,700m2 warehouse and 400m2 of split-level showroom floor, kitchen, amenities and offices.